Schedule of rates, electrical part-2 external Central public works department, Government of India Director General of Works, 2007
Material type: TextDDC classification:- 621.3 T07 CPW
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
Reference Books | Nalanda Library Reference | Reference | 621.3 T07 CPW (Browse shelf(Opens below)) | Available | 2070 |
Total holds: 0
Browsing Nalanda Library shelves, Shelving location: Reference, Collection: Reference Close shelf browser (Hides shelf browser)
No cover image available | No cover image available | No cover image available | No cover image available | |||||
621.3 T07 CPW Analysis of rates [Electrical] internal-I | 621.3 T07 CPW Analysis of rates [Electrical] internal-II | 621.3 T07 CPW Schedule of rates electrical Part-1 internal Central public works department, Government of India | 621.3 T07 CPW Schedule of rates, electrical part-2 external Central public works department, Government of India | 621.3028 T16 SAD A Signals and systems: a primer with matlab | 621.3028 T16 SAD A Signals and systems: a primer with matlab | 621.31 T11 KOT. D Power system optimization |
There are no comments on this title.